REVISITING PADIC PROGRAMME

PADIC Programme Limited is an investments company and duly registered in The Republic of Zambia whose focus on serving the comprehensive needs of businesses in the full range of the business cycle. With a core staff of experienced professionals and a team approach to customer needs, we are looking to transforming Zambia and Africa.

PADIC Programme shall acquire sophisticated technologies

PADIC Programme shall acquire sophisticated technologies

 

PADIC Programme Limited was registered to facilitate development and economical projects in Zambia. PADIC Programme Limited is involved with the communities of Zambia mainly in rural areas. The emphasis of this organisation grew to include long term community based development through network and partner with both local and international community based organisations, governmental organisations and other interested stake holder including government ministries.

 

Besides the need for Petroleum products, we need electricity

Besides the need for Petroleum products, we need electricity

 

PADIC Programme Limited develops and uses approaches that ensure its programme results in lasting and fundamental improvement in the lives of the poor and marginalised with whom we work. PADIC Programme Limited facilitates the improvement and uplifting of standards of living among vulnerable societies and promote equal opportunities in the deliveries of quality services through education, health, and agriculture by promoting economical projects in Zambia.

 

Shangombo Shall have a Modern University

Shangombo Shall have a Modern Research University

 

At the moment, PADIC Programme Limited is fully participating in Agriculture, Education, and Health programmes. Under this Business Concept note, PADIC Programme Limited seeks to undertake nine interrelated projects, these are: Sugar Plantation, Solar Power, Filling StationsGame Ranching; Cattle Ranching, Fish Farming Wheat and Rice Farming, Cassava Farming, and a Research University.

 

We want to build a modern solar power station

We want to build a modern solar power station with a total capacity of 100MW at inception and scalable to 500MW to supply power to the Shangombo Sugar Plantation, Shangombo District, Sikongo, Senanga, Mongu and other parts of Zambia besides exporting to Angola.

 

THE TENDER TO DESIGN, CONSTRUCT AND MANAGE A 100 MEGAWATT SOLAR POWER PLANT IN SHANGOMBO

The Pre-amble to the construction of a solar power plant for the Shangombo PADIC Programme.

 

THE SUGAR PLANTATION

The Sugar Plantation is the core business line for PADIC Program Limited. The first PADIC Sugar Plantation will be located in Shangombo district of Western Province Zambia. Under the Shangombo Sugar Cane Project, PADIC intends to develop an area of 30,000 hectares for irrigated land under sugar cane for sugar production.

The project area is located in Shandambi area of Shangombo District, and has been selected, mainly, due to the easy accessibly of water from Cuando River, Zambezi River and Lueti River, availability of good irrigable soils and the proximity to potential local and regional markets for sugar.

 

The Shangombo Sugar Plantation

The goal of the project is to reduce poverty levels in the Shangombo Districts of Zambia through exports of sugar from Zambia to the region and beyond. The main objectives of the PADIC – Shangombo Sugar project are to:

Develop 25,000 hectares for irrigated land in possibly 3 phases, over a period of twelve years (first and second phase 10 ,000 hectares each and the third phase of 5,000 hectares,

Irrigation for Sugar Cane and other Crops

Well designed irrigation systems for Sugar Cane and other cash crops

 

Establish 500 out grower farmers on 25,000 hectares,

Specialised Outgrowers Schemes

Specialised Outgrowers Schemes

 

Create more than 10,000 jobs for the economically active people in the area and

Well paying jobs for the masses

Well paying jobs for the masses

 

Make permanent impact in districts of Shangombo, Sioma, Senanga, Sesheke and the overall Zambian national economy.

Shangombo must be transformed into a city

Shangombo must be transformed into a city

 

REGULATORY STEPS UNDERTAKEN SO FAR

In preparation of this project, PADIC completed a Pre-feasibility Study in September 2016. Irrigation water will be taped from the Cuando river. PADIC plans to provide the project area with the proper infrastructure in terms of roads, power, housing, factory and other social and farm services. Sugar cane will be the main crop to be grown in the area to supply cane for sugar production. The chain of sugar cane plantation, production, processing and marketing of sugar will be managed through PADIC.

 

Aquaculture modernisation

Aquaculture modernisation

 

The project has the following main components:

Infrastructure Development which would comprise detailed engineering design, land preparation, drainage system, installation of irrigation head works which include pump stations, main and sub-main pipelines, storage/balancing reservoirs and infield irrigation distribution systems,

 

We need to build a modernised Shangombo

We need to build a modernised Shangombo

 

Crop development and farmers support which would mainly be production of sugarcane and food crops, the related farm machinery, and training of staff and beneficiaries,

Farmworkers pick lettuce in Shangombo

Farmworkers pick Lettuce in Shangombo

 

Farm and social infrastructure comprising solar electricity, inter-connector roads, bulk water supply, farmers’ and supervising field managers’ houses, storage facilities and office space, a school, a hospital, a shopping center, social and recreation centre, drinking water facilities and feeder roads,

 

The Housing Units and Factories

The Housing Units and Factories

 

Establishment of one biggest Sugar mills and a refinery and be the market leader.

The Sugar Refinery will be one of the biggest in Africa

The Sugar Refinery will be one of the biggest in Africa

 

THE NEED FOR A 100 MEGAWATTS SOLAR POWER PLANT

The Construction of the Solar Plant is going to Public Tendering.

The Construction of the Solar Plant is going to Public Tendering.

 

TENDER INFORMATION 

INVITATION FOR EXPRESSION OF INTEREST (EOI)

 FINANCING, DESIGNING, CONSTRUCTION AND MANAGEMENT OF THE 100MW SHANGOMBO SUGAR SOLAR PROJECT

 

INTRODUCTION:
The Republic of Zambia in general and Shangombo
District in particular, is facing a power supply deficit owing to diminished
surplus generation capacity in the region and the growing electrical energy
requirements in Zambia.  Currently, Shangombo District is operating at
500,000 kilowatts supply by the country’s power utility company, ZESCO, which
is insufficient. This has resulted into ZESCO having to switch off power from
22:00hrs in the evening up to 06:00hrs the following morning.
 
The solar power generation will be from a new solar
power plant constructed, commissioned, owned and operated, by the successful
bidder to be selected by Mo Strander Pty Limited, through an International
Closed Bid (ICB). This initiative is in line with the Zambian Government’s 7th
National Development Plan on energy of providing affordable, reliable and adequate
supply of energy for sustainable development, as well as improving access to an
efficient use of energy resources. 
 
The Mo Strander PTY Limited would therefore like to
engage companies or firms for the Design, Supply, Installation and Management
of a 100 MW Solar Power Plant with suitable storage capacity. The plant will be
located in Shangombo District, Western Province, Zambia.

 

Therefore, Expression of Interest is invited from power generation companies /Independent Power Producers (IPPs) /power plant developers / Captive Power Producers for Design, Supply, Installation and Management of a 100 MW solar power plant.

 

KEY PROJECT FEATURES

Description

Utility Scale Solar Power Project 100 MW Peak AC located in Shangombo District, Western Province, Zambia.

Employer

Mo Strander Pty Limited

Client

PADIC Programme Limited

Concessionaire Responsibility  

Financing, Designing, Construction and Management of The 100MW Shangombo Sugar Solar Project.

Payment structure

Tariff based payment based on kWh supplied to consumers as well as contributed to the national grid.

Technology

Photovoltaic

Bid Criteria

Financial assessment based on proposed tariff and full underwritten finance for project.
Legal assessment based on terms and conditions of bid.

 

PROJECT STRUCTURE

The Project includes the design, construction, ownership, financing, operation, maintenance and management of an independent solar power plant having a nominal capacity of 100 MW Peak AC under a Build, Own and Operate framework.

Subject to being able to satisfy the Minimum Functional Specification (“MFS”), bidders will be free to design and select equipment as they see fit.

The Project will be the subject of a competitive tender and a contractual framework substantially, and in line with international best practices.

It is envisaged that the Project will be privately financed through a combination of sponsor and third party equity and non / limited recourse debt.

 

INDICATIVE  TIMELINE

The indicative procurement timetable for the Project is outlined below:

Expressions of Interest issue date

7th February 2018

Expressions of Interest closing date

23 February 2018

Request for Proposal Issued

End February 2018

Tender Period

3 months

Bid Evaluations

June 2018

Award

July 2018

 

PURPOSE OF EOI INVITATION

Through this EOI, Mo  Strander PTY Limited intends to identify the suitable Solar Power Plant Developers (SPPDs) willing to venture into the FINANCING, DESIGNING, CONSTRUCTION AND MANAGEMNT of a 100 Megawatt Solar Power Station at the PADIC Programme in Shangombo District in the Western Province of the Republic of Zambia.

 

Mo Strander Pty Limited will shortlist (pre-qualify) companies based on assessment of the received expressions of interest using the information as requested. Short listed companies or firms would be invited to tender for the required services by responding to a detailed Request for Proposal (RfP).  Clarifications pertaining to this call for expression of interest may be obtained from Linda Ziume at tenders@mostranderglobal.com.  Requests for clarifications must be submitted at least seven (7) days before the closing date of the Expression of Interest.

 

Interested Companies must collect detailed Expression for Interest (EoI) documents from the address below:-

 

Mo Strander Pty Limited

Suite 68, Nedbank Mall

Nedbank Business Arena

Sandton Main Business Mall

Johannesburg, 2000

Gauteng

Republic of South Africa

Direct Phone: +27 11 056 7910

Email: tenders@mostranderglobal.com

 

Solar Power Plant to Generate 100MW of Electricity

Solar Power Plant to Generate 100MW of Electricity